According to question, work done by A in 4 days
= 4\8 = 1\2
Net work done by (A + B) in 1 day
(1\8−13) = −5\24
Work done by (A + B) in 2 days
= −5\24×2 = −5\12
∴ Work done in 6 days
= 1\2−5\12 = 1\12
∴ 11\12 of the wall is
built by A in 8×11\12 = 88\12 = 22\3
7 1\3 days.