A’s 1 day’s work = 1/8
B’s 1 day’s work in breaking the building
= 1/3
Now, according to the question,
A’s 4 day’s work = 4×1/8=12
Now, A’s and B’s 2 day’s work
=2(1\8−1\3)=2×−5/24=−10\24
Total work done in 6 days
1\2+(−10\24)=12−10\24=1\12
Remaing work = 1−1\12=11\12
Now, A has to complete the work, so A can complete in x days.
18×x=11\12=> x=11×8\12
x=11×2\3=7 1\3days.